Concrete Core Activation for Fast-Reacting Heating and Cooling

concrete core activation during shell construction with BEKA prefabricated units

By means of the concrete core activation method preconditions for radiant heating and cooling comfort are already created in the shell construction phase.

As a prefabricated, finished element B.RBO.30 the BEKA capillary tube mat is integrated in the concrete ceiling. Placed directly on the surface, the fast-reacting concrete core activation is extremely dynamic in its temperature control behaviour for high radiant heating and radiant cooling requirements.

Reference: Architect's Office Michael

 

References

  • Olympic Village Vancouver
    Olympic Village Vancouver
  • Abgeordnetenhaus Berlin (Parliament)
    Abgeordnetenhaus Berlin (Parliament)
  • Oberbaum City Berlin
    Oberbaum City Berlin
  • Twin Tower Wien
    Twin Tower Wien
  • Spree Palais Berlin
    Spree Palais Berlin
  • Wine Cellar in Spain
    Wine Cellar in Spain
  • Architects' Office Michael
    Architects' Office Michael
  • Canadian Embassy in Berlin
    Canadian Embassy in Berlin
 
BEKA Heiz- und Kühlmatten GmbHPankstrasse 8-10 | 13127 Berlin | Tel: +49 30 474 114 31 | Fax: +49 30 474 114 35