Federal Ministry of the Interior, Berlin

Energy efficient quality as part of a holistic energy concept

  • Architects: Müller Reimann Architekten, Berlin
  • Construction period: 2011-2014
  • Design: 20,000 m² plaster ceiling providing combined heating and cooling
  • Location: Berlin

 

The new-build scheme is supplied with heat using geothermal energy, waste heat and district heating. A radiant ceiling heating system with BEKA capillary tube mats, which also provides cooling in summer, ensures an optimal, energy-saving distribution of heat in all office spaces.

Plaster heating and cooling ceiling