Energy efficient quality as part of a holistic energy concept
- Architects: Müller Reimann Architekten, Berlin
- Construction period: 2011-2014
- Design: 20,000 m² plaster ceiling providing combined heating and cooling
- Location: Berlin
The new-build scheme is supplied with heat using geothermal energy, waste heat and district heating. A radiant ceiling heating system with BEKA capillary tube mats, which also provides cooling in summer, ensures an optimal, energy-saving distribution of heat in all office spaces.
Plaster heating and cooling ceiling