HumboldtHafenEins, Berlin

The building was built in accordance with the highest standards stipulated by the German Sustainable Building Council (DGNB).

  • Architects: KSP Jürgen Engel Architekten
  • Construction period: 2014/2015
  • Design: 10,000 m² plaster-based and dry-lined ceiling with BEKA capillary tube mats
  • Location: Berlin

 

K.S15 capillary tube mats were deployed for the plaster cooling ceilings in this new office project. For part of the ceiling surfaces BEKA manufactured special mats with oblique distribution pipes that fit in perfect harmony with the architecturally unusual slanting walls.

Product data: Capillary tube mat K.S15