Twin Tower, Vienna

|   Austria

Building cooling with chilled ceilings consisting of prefabricated metal ceiling panels

Architect: Massimiliano Fuksas

Developer: Wienerberger AG

Construction period: Autumn 2000

Design: 29,000 m² of active cooling area provided by metal ceiling panels to ensure efficient building cooling

 

Quick installation thanks to maximum preparation of the metal ceiling panels in the factory.